Sign In | Join Free | My autochinanet.com
China Sansion Power Electric Co., Ltd. logo
Sansion Power Electric Co., Ltd.
Building A One-stop Service Platform
Verified Supplier

1 Years

Home > Transformer Test System >

Power Transformer Comprehensive Testing System for High-Capacity Transformers, Integrated Factory Test Equipment with Electrical Measurement,

Sansion Power Electric Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Power Transformer Comprehensive Testing System for High-Capacity Transformers, Integrated Factory Test Equipment with Electrical Measurement,

Model Number : SXBZ

Voltage levels : Adjustable

MOQ : 1

Testing efficiency : Improved

Delivery Time : 30 Working Days

Brand Name : Sansion Power

Testing functions : Customizable

Place of Origin : China

Testing data : Precise

Certification : CE/SGS/EMS/ISO 9001

Measurement technology : Advanced

Payment Terms : L/C,T/T

System configuration : Flexible

Packaging Details : Plywood Case

Contact Now

Product Overview

The Power Transformer Comprehensive Testing System is a configurable solution engineered for routine electrical tests, dielectric testing, factory acceptance, and selected advanced diagnostic applications. It is purpose-built for transformer manufacturers and high-voltage testing laboratories that handle power transformers with demanding testing requirements.

Compared with a basic routine test bench, a power transformer testing system may require higher-capacity power supplies, wider measurement ranges, specialized dielectric test equipment, and additional safety arrangements. Depending on transformer capacity, voltage class, design, and contractual requirements, the system can integrate routine electrical measurements with selected advanced testing modules. Options may include capacitance and tan delta measurement, partial discharge measurement, temperature-rise testing, and impulse voltage testing when specifically engineered and supplied.

The complete system should be designed around a detailed test matrix that identifies the required test methods, equipment ratings, measurement accuracy, safety provisions, and acceptance criteria.

Main Testing Functions
  1. Transformer turns ratio and vector group testing
  2. DC winding resistance measurement
  3. No-load loss and no-load current testing
  4. Load loss and short-circuit impedance measurement
  5. AC power-frequency withstand voltage testing
  6. Induced voltage withstand testing
  7. Capacitance and tan delta measurement, when configured
  8. Partial discharge measurement, when configured
  9. Temperature-rise testing, when configured
  10. Lightning impulse testing, when configured
Typical Applications
  • Power transformer manufacturing plants
  • High-voltage testing laboratories
  • Transformer type-test facilities
  • Utility equipment inspection centers
  • Research and development laboratories
  • Major power project acceptance testing
Customer Pain Points and Solutions
Complex Testing Requirements

Equipment selection can be difficult when testing requirements are complex. A project-specific test matrix clarifies the required equipment and capabilities.

High Laboratory Investment

Careful planning is essential for significant capital investment. Modular configurations may allow essential testing functions to be prioritized.

Limited Installation Space

Space constraints can complicate installation. Laboratory layout and electrical clearances should be considered during the engineering phase.

Advanced Testing Needs

Advanced testing requires specialized systems. Dedicated equipment modules can be specified for individual test categories.

Frequently Asked Questions
Q1: Can the system perform routine, type, and special tests?

A suitably configured facility may cover multiple test categories, but the required equipment and capacity depend on the individual tests.

Q2: Can it test transformers above 100 MVA?

This depends on the specified test methods and the capacity of each subsystem. Transformer MVA alone does not determine the required equipment ratings.

Q3: Is partial discharge testing included?

It can be specified as an additional function, subject to the required measuring system and test circuit.

Q4: Can impulse voltage testing be integrated?

It can be included in a coordinated laboratory facility but generally requires a dedicated impulse generator, measuring equipment, and appropriate safety provisions.

Q5: What information is needed for engineering?

Provide transformer ratings, voltage classes, insulation levels, winding configuration, required tests, applicable standards, and site conditions.

Contact us for a project-specific power transformer testing system designed around your technical requirements and laboratory capabilities.

Power Transformer Comprehensive Testing System for High-Capacity Transformers, Integrated Factory Test Equipment with Electrical Measurement,

Product Tags:

Power Transformer Testing System

      

High-Capacity Transformer Factory Test Equipment

      

Transformer Dielectric Testing System

      
China Power Transformer Comprehensive Testing System for High-Capacity Transformers, Integrated Factory Test Equipment with Electrical Measurement, factory

Power Transformer Comprehensive Testing System for High-Capacity Transformers, Integrated Factory Test Equipment with Electrical Measurement, Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Sansion Power Electric Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)